Power Plants

Clients


Nirma Ltd., Kalatalav,Bhavnagar,Gujarat - India.

Project : Soda Ash

M/s Lentjes Energietechnic, gmbh of Germany, OEM for 3 Nos CFB Boilers awarded the refractory component of the contract to M/s. NV Gouda Vuurvast, Netherlands on turnkey basis. In view of Padmaja’s experience and capabilities, M/s NV Gouda Vuurvast selected Padmaja as their Indian partner to share the entire responsibility for this job which included supply of certain Indian products, detailed engineering and project execution and commissioning. For the excellent services offered by Padmaja, M/s NV Gouda Vuurvast honored Padmaja in Netherlands.

(back to top)
Job Description Client Materials Used Duration
Refractory lining in three Nos of CFBC boilers including heating up up to 500 c Lentjes Energitechnic Gmbh. Germany High Alumina Bricks, Castables, Gunning Dense and insulating Refractory Mixes, Dense and insulating castables, calcium silicate blocks, ceramic paper, blankets and boards and SS anchors (all dense materials has been imported) 12 Months
Refractory repair in burner area in boiler B Nirma ltd Dense Castable. 15 Days
Refractory repair in burner area in boiler A Nirma ltd Dense Castable. 15 Days
Refractory repair in burner area in boiler C Nirma ltd Dense Castable. 15 Days
Refractory Relining in the Lime kiln No 2 Nirma ltd Dense and Refractory bricks. 30 Days
Refractory Relining in the Lime kiln No 4 Nirma ltd Dense and Refractory bricks. 30 Days
Refractory Relining in the Lime kiln No 2 Nirma ltd Dense and Refractory bricks. 30 Days

Jindal Tractobel Power Corporation Ltd, Bellary.
(back to top)
Job Description Client Materials Used Duration
Refractory lining in drag chain conveyor unit II in ash handling system and Pre-heating up to 350 c Artson engineering Pvt. Ltd Low cement castables 45 days

Mysore Paper Mills Ltd, Badravathi.
(back to top)
Job Description Client Materials Used Duration
Refractory Re-lining in 3 nos coal fed/ conventional boilers Mysore Paper mill Dense castable 1 month
Refractory lining in one number CFBC Boiler. Enmass Engg. Pvt. Ltd Designed by Foster Wheeler Pyro Power inc. Self flow castable, insulating and dense castable, Anchors, Ceramic paper and blanket etc. 2 months.

Rain Calcining Ltd, Vizag.
(back to top)
Job Description Client Materials Used Duration
Refractory lining in reactor Shell Thermax Ltd Dense Bricks and Castable 2 months

B.H.E.L, Trichy.
(back to top)
Job Description Client Materials Used Duration
Refractory lining in Boiler ACC LTD Dense and insulating Castable 6 months